Welcome to www.linknewnet.com.

New Promotion

-52%
Cisco C6800-8P40G-XL Catalyst 6800 Series 8-Port 40 Gigabit Ethernet Module
$81347 $38800
-94%
C6800-48P-TX-XL Cisco 6807 Switch Gigabit Ethernet Copper Module with DFC4XL
$24200 $1400
-26%
A9K-RSP880-SE Cisco ASR 9000 Series Route Switch Processor 880
$5833 $4300
-86%
Cisco ASR 9000 Service Module A9K-2T20GE-B
$3454 $500
-25%
A99-12X100GE
$22500 $16806

Cisco Nexus N9K-C93180YC-EX Switch Configuration Guide
Jun 05 , 2025 281

Cisco Nexus N9K-C93180YC-EX Switch Configuration Guide

Enterprise-Grade Data Center Deployment

1. Core Performance Validation
(vs N9K-C93180YC-FX)

SpecificationN9K-C93180YC-EXN9K-C93180YC-FX
Switching Capacity2.4 Tbps1.8 Tbps
Forwarding Rate1.2 Bpps900 Mpps
Memory32GB DDR416GB DDR4
StorageDual 120GB SSDDual 64GB SSD
Boot Time18 seconds25 seconds

N9K-C93180YC-EX(水印).png

2. VXLAN Configuration

switch(config)# feature nv overlay  
switch(config)# vlan 100  
switch(config-vlan)# vn-segment 500100  
switch(config)# interface nve1  
switch(config-if)# source-interface loopback0  
switch(config-if)# member vni 500100  
switch(config-if-nve-vni)# mcast-group 239.1.1.100

3. Power Efficiency

switch# show environment power 
Power Supply 1: 1200W (Max: 1200W)  
Idle Ports: 0.2W/port  
switch(config)# hardware profile power redundancy-mode redundant

4. Compatibility Testing

Device/SoftwareTest Result
VMware vSphere 8.0VXLAN EVPN setup <3s
Arista 7280RCross-vendor MLAG stable
NVIDIA InfiniBandRDMA over Converged Ethernet
Kubernetes CalicoSeamless CNI integration

5. Critical Troubleshooting

switch# show forwarding distribution dynamic 
Path 1: Eth1/1 [Active] - 45% traffic  
switch# show hardware internal tah event-history  
[ERR] Port 1/24: Buffer congestion - Enable PFC

6. TCO Analysis

ItemCost Detail
Initial Investment$22,500 (w/ Advanced License)
5-Year Savings$18,200
- Energy Reduction35% (vs competitors)
- Fiber Converter Savings$12,000 (48 ports)
- Maintenance40% fewer failures


Related Blogs

WhatsApp
Quote
Contact
Top